Cloud Migration Services

Seamless Cloud Migration with Zero Downtime

From assessment and 6 Rs strategy to zero-downtime migration and FinOps optimization — we move your workloads to AWS, Azure, or GCP with minimal risk and maximum cost savings.

6 Rs StrategyRight approach per workload Zero DowntimePlanned cutover FinOpsCost optimization
ERP Application
Rehost +
Oracle Database
Replatform +
Web Portal
Refactor +
Legacy App
Retire +
Workloads42
Migrated38
Cost Saved40%

Migration Capabilities We Deliver

Assessment 6 Rs Rehost Replatform Refactor Database Migration Data Center Exit FinOps SAP on Cloud Assessment 6 Rs Rehost Replatform Refactor Database Migration Data Center Exit FinOps SAP on Cloud
0
Success Rate
0
Cost Reduction
0
Downtime
What We Deliver

Complete Cloud Migration Services

End-to-end migration engineering — assessment, strategy, execution, and optimization for enterprise and government workloads.

Migration Assessment (6 Rs)

Discover, analyze, and classify every workload using the 6 Rs framework — rehost, replatform, refactor, repurchase, retire, or retain.

Migration Factory

Standardized, repeatable migration patterns with automated tooling — moving hundreds of workloads at scale with consistency.

Database Migration

Oracle, SQL Server, MySQL, PostgreSQL — homogeneous and heterogeneous migrations with DMS, schema validation, and cutover planning.

Application Modernization

Containerization, microservices decomposition, serverless conversion, and cloud-native redesigns for legacy applications.

Data Center Exit

Complete DC decommission — hardware audit, data sanitization, network rewiring, and government compliance documentation.

FinOps Optimization

Right-sizing, reserved instances, spot strategies, cost allocation tags, and monthly optimization reports to cut cloud spend.

SAP on Cloud

SAP HANA migration, SAP on AWS/Azure/GCP, and hybrid SAP landscapes with certified migration paths and validation.

DR Migration

Disaster recovery setup on cloud with cross-region replication, automated failover, and RPO/RTO-aligned recovery plans.

Platform Flexibility

Choose Your Cloud Platform

We migrate to the cloud that fits your workload — or build a multi-cloud strategy.

AWS

The broadest cloud platform with Migration Hub, MGN, DMS, and 200+ services for any workload.

Most Popular

Azure

Enterprise-first with Azure Migrate, hybrid connectivity, and deep Microsoft ecosystem integration.

Enterprise

GCP

Data analytics and AI-first cloud with Google Migrate, Anthos hybrid, and BigQuery integration.

Data & AI

Kubernetes / Docker

Containerized workloads with K8s orchestration — portable across any cloud or on-premises.

Portable

Terraform

Infrastructure as Code for reproducible, version-controlled cloud environments across providers.

IaC
How We Work

From On-Premise to Cloud in 4 Steps

A transparent, milestone-driven process — you always know what happens next.

01

Assessment & Discovery

We inventory your workloads, analyze dependencies, and classify each application using the 6 Rs framework.

Week 1–2
02

Strategy & Planning

Migration waves, target architecture, cutover plans, cost projections, and rollback procedures designed and approved.

Week 3–4
03

Migration Execution

Wave-by-wave migration with automated tooling, data validation, performance testing, and zero-downtime cutover.

Week 5–12
04

Optimization

Post-migration FinOps, right-sizing, reserved instance planning, and ongoing cost optimization reporting.

Ongoing
Why TPROSYS IT

Migration Experts, Not Just Cloud Enthusiasts

We combine deep migration methodology with FinOps expertise to move your workloads to cloud with minimal risk and maximum cost savings.

  • 6 Rs Methodology
  • Zero Downtime
  • FinOps
  • Multi-Cloud
  • Govt Cloud (MeitY)

6 Rs Methodology

Every workload gets the right migration strategy — no one-size-fits-all. We rehost, replatform, or refactor based on your goals.

Zero Downtime

Planned cutovers with rollback procedures, blue-green deployments, and DNS-based traffic switching for risk-free transitions.

FinOps-Driven

Cost optimization from day one — right-sizing, spot instances, reserved capacity, and monthly spend reports to keep bills predictable.

Technology

The Tech Stack Behind Your Migration

Battle-tested migration tools and platforms chosen for reliability, speed, and cost efficiency.

AWS Migration

AWS Migration Hub MGN DMS

Azure Migration

Azure Migrate

Google Cloud

Google Migrate Anthos

Infrastructure & Tools

Kubernetes Serverless Veeam Rubrik VMware Cloud
FAQ

Frequently Asked Questions

Quick answers about migration timelines, downtime, SAP, data security, and support.

A typical enterprise migration with 30–50 workloads takes 8–12 weeks from assessment to production cutover. Larger migrations with 100+ workloads or SAP may take 12–20 weeks. We provide a detailed wave plan after discovery.
For most workloads, we achieve zero or near-zero downtime using live replication, blue-green cutovers, and DNS-based traffic switching. For databases, we use continuous replication with a brief cutover window during off-peak hours.
Yes. We migrate SAP ECC, S/4HANA, and Business One to AWS, Azure, and GCP using certified migration paths. We handle HANA database migration, SAP certification validation, and hybrid SAP landscapes.
All data is encrypted in transit (TLS 1.3) and at rest (AES-256). We use private network links, VPN tunnels, and dedicated migration accounts with least-privilege access. Post-migration, source data is sanitized per your compliance requirements.
Yes. We offer post-migration stabilization (2–4 weeks), ongoing FinOps optimization, cloud management, and AMC support with SLA-backed response times to ensure your cloud environment stays secure and cost-efficient.
Let's Talk

Ready to Move to the Cloud?

Tell us about your current infrastructure and migration goals. Our cloud experts will get back to you within 24 hours with a tailored assessment and migration plan.

Get a Free Consultation

No obligation — just a clear migration roadmap for your workloads.